We've seen your rig; now let's see your timeline.

General discussion of Anime Music Videos
Locked
User avatar
Bauzi
Joined: Fri May 21, 2004 12:48 pm
Status: Under High Voltage
Location: Austria (uhm the other country without kangaroos^^)
Contact:
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by Bauzi » Tue May 19, 2009 5:54 pm

@Megamon:

Looks like and impressive though, but I suggest that you might want to edit in AE in a more object-orianted way. Example: Why don't you put all your solid into one background composition? Ok it's often not necessary, but it makes changes so much easier and you gain a better overview in your composition timeline :|
You can find me on YT under "Bauzi514". Subscribe to never miss my AMV releases. :amv:

User avatar
JudgeHolden
Joined: Mon Mar 14, 2005 8:49 am
Status: Looking at you through your window!
Location: The great white north (Minneapolis)
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by JudgeHolden » Tue May 19, 2009 11:34 pm

Megamon is just trying to get laid; leave the poor guy to his quest. :P

micktam12
Joined: Sat Dec 06, 2008 11:12 pm
Location: Aussie homeland XD
Contact:
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by micktam12 » Thu May 21, 2009 7:26 am

http://s572.photobucket.com/albums/ss16 ... C02185.jpg

There are another two pictures, This one was my Hellsing Breaking me down AMV
Image

micktam12
Joined: Sat Dec 06, 2008 11:12 pm
Location: Aussie homeland XD
Contact:
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by micktam12 » Thu May 21, 2009 7:42 am

My upcoming Project

http://s572.photobucket.com/albums/ss16 ... icture.jpg

http://s572.photobucket.com/albums/ss16 ... cture2.jpg

Yeah thats right all 3D moved images lol. It was hard making it, lol now i just need to get the anime.
Image

User avatar
Ijexis
Joined: Thu Aug 31, 2006 12:53 am
Status: Compliant Model Basis 2.1
Location: Unilateral Matrix 001
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by Ijexis » Thu May 21, 2009 12:29 pm

micktam12 wrote:http://s572.photobucket.com/albums/ss16 ... C02185.jpg

There are another two pictures, This one was my Hellsing Breaking me down AMV
Feels like I'm climbing a stairway. Due to the setup, I can assume you work going up? I tend to do the same also.
Image

micktam12
Joined: Sat Dec 06, 2008 11:12 pm
Location: Aussie homeland XD
Contact:
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by micktam12 » Thu May 21, 2009 5:38 pm

Lol, yeah u are kind of right

There were also alot of key frames, and im to lazy to do it in 1 video track, there were also alot of different color modes.
If you watch the AMV then u will understand.

:)
Image

User avatar
dreamawake
Prodigal Pen-Throttle
Joined: Mon Apr 17, 2006 1:50 pm
Status: NMEs Prodigy
Location: Nowheresville, NJ
Contact:
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by dreamawake » Thu May 21, 2009 7:10 pm

You know 9 times out of 10 you don't even need more than 5-10 vegas layers. People get ridiculous with that shit. I've always started with a base of 3 layers and added more as they were really needed. Seems like a really cluttered and messy way to do shit with 40+ layers for basic cuts, if you're going to do that you might as well edit entirely in AE. |:
Image

User avatar
Inan
Another one
Joined: Mon Dec 03, 2007 8:18 pm
Status: bored
Contact:
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by Inan » Thu May 21, 2009 8:32 pm

I usually stick to 3 video tracks because since im editing on a laptop and the screen isnt all that big i end up getting confused if i have way too many and i also dont like to do much scrolling.

Image

User avatar
Ijexis
Joined: Thu Aug 31, 2006 12:53 am
Status: Compliant Model Basis 2.1
Location: Unilateral Matrix 001
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by Ijexis » Thu May 21, 2009 9:00 pm

ArashinomeAMV wrote:You know 9 times out of 10 you don't even need more than 5-10 vegas layers. People get ridiculous with that shit. I've always started with a base of 3 layers and added more as they were really needed. Seems like a really cluttered and messy way to do shit with 40+ layers for basic cuts, if you're going to do that you might as well edit entirely in AE. |:
Well yea, that's true, usually I don't go past 8-12, any higher is because I was too lazy to reorganize the clips and the one i'm putting in works best above the previous and thus i tend to add layers just for that one or two clips. I usually start with 1 or 3 audio tracks (depending) and 2 video tracks.
Image

User avatar
Koopiskeva
|:
Joined: Sun Mar 17, 2002 7:31 pm
Status: O:
Location: Out There Occupation: Fondling Private Areas ..of the Nation.
Contact:
Org Profile

Re: We've seen your rig; now let's see your timeline.

Post by Koopiskeva » Thu May 21, 2009 10:59 pm

1 layer.
Hi.

Locked

Return to “General AMV”